If you are planning on remodeling your master bathroom, there are many variables to consider. Every bathroom project is different and every contractor works differently. However, there are some basic steps that will divide the entire project into small sequences to help you eventually reach the result. The below information will walk you through these steps that are spread over the course of 6 weeks.
Remodeling Bathroom – Week 1
In order to remodel a bathroom – whether it is the size of an apartment walk-in closet or a spacious living room – the first and foremost thing to do is make the decision to remodel. What are the problems that need to be handled in an existing bathroom space and what are the goals involved? Gather trends as much as possible and determine the one that suits your needs and budget. Obtain financing if you cannot afford to pay out of your pocket. Also, make sure to collect information about various contractors in your local area and if possible arrange an interview with each one of them. Select the best contractor available.
Remodeling Bathroom – Week 2
After you have completed the above mentioned tasks, it is time to make a complete walk-through of the existing space. Ask contractors as many questions as possible and get answers to all of them before laying the foundation for your project. Again, make sure that the project is feasible within the budget.
Remodeling Bathroom – Week 3
Here, you will discuss with the contractor about materials, equipment, tools, presentation of drawings and other project specifications. You will be discussing various options that are available and sign the design agreement as well. The week 2 and week 3 tasks can be combined if time permits. Additionally, this is the time to review complete drawings, notes and clarify any doubts about the intent of the project. You will be selecting products for the bathroom, signing the construction contract and making the first down-payment during this phase. Most contractors will make sure that your project has required permits to move forward with the remodeling.
Remodeling Bathroom – Week 4 and 5
After permits are obtained, it is time to finalize the project schedule and distribute it. Order products, discuss the impact of your project with other family members and keep them as well as pets safe, preferably out of the workplace. Remove any personal belongings that is blocking the pathway or remodeling site. Complete the demolition, framing, installing drywall, cabinetry, fixtures and much else during this and the following week.
Remodeling Bathroom – Week 6
This is the week where you give the final touch to the detail. Inspect the ongoing job and establish a list of tasks with ultimate details to ensure that the project is completed to your satisfaction. Always keep your eye on the goal and know that you are taking part in an adventure that will add value to your property. Finally, make a completion payment to the contractor. Keep in mind that the above time span is just an estimation. It may be longer or shorter depending on the size of your bathroom and the scope of your project.
Last but not least, a well-designed bathroom can go a long way in improving your health and lifestyle. In order to make your bathroom everything you want it to be, it is essential that you learn the process of remodeling in detail. Although you are not the one doing the job, knowledge of what goes in a typical remodeling project will not only save you time and money, but make you prepared for your future home projects.